Post Construction Cleaning Service Overview
Why Choose Our Post Construction Cleaning Services
- Full-scale elimination of post-construction pollutants
- Material-safe cleaning for high-end finishes and sensitive surfaces
- Specialized treatment for dust settling in HVAC, vents, and crevices
- Conducted by bonded, insured, and fully equipped specialists
- Quiet, detail-oriented service performed with discretion
When to Book Cleaning Services After Construction
- 2-3 weeks prior to completion of construction or interior renovations
- Prior to handoff to clients, tenants, or property managers
- Before occupancy or staging for move-in or walkthroughs
- As a preparatory phase ahead of market listing or inspection
- When post-construction dust or residue is detectable in the air or on surfaces
The Unseen Residue of Construction
Our Post Construction Cleaning service includes:
						
							Advanced
 Particulate
 Extraction						
					
				
									Removes fine construction dust, insulation fibers, and airborne debris using commercial-grade HEPA systems.
						
							Precision
 Detailing for New
 Surfaces						
					
				
									Cleans freshly installed surfaces, fixtures, and finishes with non-toxic, surface-specific methods to prevent damage.
						
							Occupancy-Ready
 Environmental
 Reset						
					
				
									Re-establishes a breathable, contaminant-free environment ready for move-in, final walkthrough, or client turnover.
Advanced Particulate Extraction
Removes fine construction dust, insulation fibers, and airborne debris using commercial-grade HEPA systems.
Precision Detailing for New Surfaces
Cleans freshly installed surfaces, fixtures, and finishes with non-toxic, surface-specific methods to prevent damage.
Occupancy-Ready Environmental Reset
Re-establishes a breathable, contaminant-free environment ready for move-in, final walkthrough, or client turnover.
Final Touches That Make the Difference
Popular Questions
					 How soon after construction can the cleaning be scheduled? 
							
			
			
		
						
				We typically recommend scheduling once all major work is complete and dust-generating activity has ceased. However, we can coordinate with contractors to time our service at the optimal point before occupancy or turnover.
